Product Overview
Everything you need for uninterrupted fleet charging.
The GTP Charging Dock uses infrared-guided docking and CC/CV charging to deliver a full charge cycle in 4 hours — safely and reliably every time.
How the Charging Dock Works
When a GTP AMR's battery drops below the configured threshold, the fleet management software dispatches it to the nearest available charging dock. The AMR approaches, aligns using the dock's IR beacon and engages the charging contacts automatically. Once fully charged, it returns to its task queue.
- Automatic docking precision — ±5 mm alignment
- Fast charge cycle — 0 to 100% in 4 hours
- Multi-robot queue management
- Status LED indicators — Red / Amber / Green
- Safety interlock prevents AMR movement during charge
- Compatible with all current GTP-AMR models
At a Glance
4 hrs
Charge Time
48 V DC
Output Voltage
±5 mm
Docking Accuracy
All models
AMR Compatibility
Multi-dock arrays can be configured for large fleets, with the fleet software automatically distributing charge sessions across available docks to minimise wait time.
Specifications
Full technical specifications.
Detailed specifications for the GTP Charging Dock to assist with your facility planning and integration.
| Output Voltage | 48 V DC |
| Output Current | 30 A |
| Charging Time | 4 hours (full charge) |
| Docking Accuracy | ±5 mm |
| Compatibility | All GTP-AMR models |
| Operating Temperature | 0 – 45 °C |
| Protection Class | IP20 |
| Dimensions | 600 × 400 × 180 mm |
Why Choose the GTP Charging Dock
Designed for zero downtime fleet operations.
Every design decision in the Charging Dock was made to eliminate manual work and keep your fleet on the floor.
No Manual Intervention
Robots dock and charge autonomously — your operators never have to plug in a single cable.
24/7 Fleet Operation
Smart charging windows scheduled around production shifts keep the fleet available round the clock.
Minimal Footprint
The compact dock fits in existing aisle space and requires only a standard 3-pin industrial outlet.
Easy Installation
Bolt to the floor, connect power and register in the fleet software — up and running in under 2 hours.
Keep your fleet charged and production-ready.
Contact our team to discuss the right number of charging docks for your fleet size and shift pattern.
